Russia 2018 - FIFA World Cup
- Published in Frontpage rotator
K-FLEX RUSSIA - FIFA world cup 2018
Since the first half of 2012, K-FLEX Russia has been supplying technical heat insulation for a number of large Russian stadiums : Moscow, Saint-Petersburg, Saransk, Kazan, Ekaterinburg, Sochi...
K-FLEX products were installed for heating pipes, water supply, air conditioning, ventilation systems, and acoustic insulation.
Stadium “Opening Arena" - Moscow, capacity of 45,000 people - in the 1-2 quarter of 2014 the materials K-FLEX ST were installed for heat pipes, water supply and air conditioning. Total supply volume was more than 300 m3 of technical heat insulation K-FLEX.
Stadium “Luzhniki” - Moscow, capacity of 81,000 people - in the 1-2 quarter of 2015 the materials K-FLEX ST and K-FLEX AIR were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 450 m3 of technical heat insulation K-FLEX.
Stadium “Nizhny Novgorod” - Nizhny Novgorod, capacity of 44,900 people - in the 2-3 quarter of 2017 the materials K-FLEX ST and K-FLEX AIR were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 1500 m3 of technical heat insulation K-FLEX.
Stadium “Mordovia Arena” - Saransk, capacity of 45,000 people - in the 3-4 quarter of 2017 the materials K-FLEX ST and K-FLEX AIR were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 800 m3 of technical heat insulation K-FLEX.
Stadium “Kazan Arena” - Kazan, capacity of 45,000 people - in the 3-4 quarter of 2012 the materials K-FLEX ST, K-FLEX AIR, K-FLEX AL CLAD were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 1300 m3 of technical heat insulation K-FLEX.
Stadium “Saint-Petersburg” - Saint-Petersburg, capacity of 67,800 people - in the 1-2 quarter of 2017 the materials K-FLEX ST, K-FLEX AIR, K-FLEX AL CLAD, K-FLEX Supports were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 2000 m3 of technical heat insulation K-FLEX.
Stadium “Ekaterinburg Arena” - Ekaterinburg, capacity of 35,000 people - in the 3-4 quarter of 2017 the materials K-FLEX ST, K-FLEX AL CLAD were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 800 m3 of technical heat insulation K-FLEX.
Stadium “Fisht” - Sochi, capacity of 44,000 people - in the 1-2 quarter of 2012 the materials K-FLEX ST/SK, K-FLEX AIR were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 1500 m3 of technical heat insulation K-FLEX.
Stadium “Rostov Arena” - Rostov-on-Don, capacity of 43,700 people - in the 2-3 quarter of 2017 the materials K-FLEX ST were installed for heat pipes, water supply, air conditioning. Total supply volume was more than 500 m3 of technical heat insulation K-FLEX.
Stadium “Kaliningrad” - Kaliningrad, capacity of 35,000 people - in the 3-4 quarter of 2017 the materials K-FLEX ST were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 600 m3 of technical heat insulation K-FLEX.
Stadium “Volgograd Arena” - Volgograd, capacity of 45,000 people - in the 3-4 quarter of 2017 the materials K-FLEX ST, K-FLEX AIR were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 800 m3 of technical heat insulation K-FLEX.
Stadium “Samara Arena” - Samara, capacity of 44,900 people - in the 3-4 quarter of 2017 the materials K-FLEX ST, K-FLEX AIR, K-FLEX AL CLAD, K-FONIK ST GK were installed for heat pipes, water supply, air conditioning and ventilation system. Total supply volume was more than 1000 m3 of technical heat and acoustic insulation K-FLEX.